Instruction Manual

Form No. EBOOSTERM-0321
16
English
INSTALLATION
Temperature/
Pressure Gauge
Pressure Reducing Valve
with High Pressure By-pass
(20 psi [138 kPa] flow
pressure maximum)
Temperature/
Pressure Gauge
Shock Absorber
for water hammer.
Discharge from T/P Valve.
Air gap must comply
with plumbing code.
3/4″ Gate or
Ball Valve
Blended Phosphate Water
Treatment System
Back
Pressure
Relief Valve
Inlet
Temperature/Pressure
Relief Valve, 150 PSI/210°F
(1034 kPa/99°C)
Flow
Restrictor
Floor Drain
Drain Valve
NOTE: Centerline of booster “T” fitting must
not extend closer than 102 mm (4) to the floor.
Copper Water Inlet
from primary
water heater.
Copper Outlet
to Dishwasher.
Temperature/
Pressure Gauge
Temperature/
Pressure Gauge
Floor Drain
Shock Absorber
for water hammer.
Discharge from T/P Valve.
Air gap must comply
with plumbing code.
3/4″ Gate or
Ball Valve
Blended Phosphate Water
Treatment System
Outlet
Back
Pressure
Relief Valve
Inlet
Drain Valve
Pressure Reducing Valve
with High Pressure By-pass
(20 psi [138 kPa] flow
pressure maximum)
Temperature/Pressure
Relief Valve, 150 PSI/210°F
(1034 kPa/99°C)
Copper Water Inlet
from primary
water heater.
Copper Outlet
to Dishwasher.
Mini-Compact Models
Compact Series
Plumbing Connections
WARNING
Valves, gauges, and unions must be installed per diagram
to ensure proper operation, servicing, and warranty
coverage.
Not supplied, but is available as an option/accessory.
Not supplied with booster heater.