Manual
34
5. Initial Operation
NOTE!
During shipment, condensation moisture
can accumulate in the stove’s interior,
which may possibly lead to the appear-
ance of condensation or water on the
stove or ue pipes. Please dry off these
damp areas immediately.
The surface of your stove was treated in a sand-
blasting machine before applying the colour coat-
ing.Despitecarefulandthoroughinspection,there
may still be some residual material in the stove
body,whichcanfalloutwhenyourstoveisbeing
installed.
NOTE!
To prevent any damage, please immedi-
ately vacuum up these small steel pellets
with a vacuum cleaner.
Thersttimeastoveisoperated,theheatdevelop-
ment causes the emission of volatile components
fromthecoating,sealingstripsandlubricants,and
smoke and odours can occur.
Atahighercombustiontemperature,thisone-time
process can take between 4 to 5 hours.
To achieve this higher combustion temperature,
please increase the fuel quantity recommended
in Section 7, „Adding Fuel/Heating with Nominal
ThermalOutput“,byapproximately25%.
CAUTION!
To prevent adverse effects on health, no-
body should stay in the room(s) during
this process unless absolutely necessary.
Make sure the room is well-ventilated and
open the windows and outside doors. If
needed, use a fan for faster air circula-
tion.
If the maximum temperature is not reached dur-
ingtherstheatingoperation,youmaynoticean
odour for a short period of time the next time the
stove is used as well.
6. Lighting the Fire
Theringupphaseshouldbeas shortaspossi-
ble,sincehigheremissionscanoccurduringthis
phase.
The slider settings described in Table 1 are rec-
ommendations that were determined under con-
formance testing conditions, in compliance with
the relevant standard. Depending on the weather
conditions and the draught capability of your chim-
ney,accordinglyadjustthesliderpositionsforyour
Como to the local conditions.
NOTE!
The Como may only be operated when the
re box door is closed; the re box door
may only be opened to add fuel.
WARNING!
Never use spirits, petrol, or other amma-
ble uids to light the stove.
Lighting the Fire
Procedure Position of Control
Elements
Completely open primary
and secondary air.
Pull primary and secondary
air slider all the way out.
(fi g. 3)
Open fi re grate. Pull out fi re grate slider.
Pile up any remaining ash
and unburned Charcoal
into the centre of the
combustion chamber.
Place 2-3 small logs into
the middle of the fi re box;
stack approx. 0.5 kg of
dry wood chips on top.
Light the ignition material
at several places.
Tab. 1
g. 3
(I)
(II)










