Installation Guide

8
Wiring Diagram
A. The Baler Power/Communication Harness (006-6650LS2) will attach to the open port of the Tractor Harness
(006-6650TM) and run back to the Dual Channel Processor (006-6671LS). Connect the large plug of the Baler
Power/Communication Harness (006-6650LS) to the bottom (shorter side) of the DCP.
B. Attach the Baler Interface Harness (006-6650VA) in between the short whip cable hardwired to the DCP and
the main Power/Communication Harness (006-6650LS2). Make sure Active Terminator removed from the top of
the baler processor is attached to Baler Interface Harness (006-6650VA).
C. Install green terminator (006-5650Z) to the port labeled Modular Port on the Pump Controller (006-5672).
D. Attach moisture / bale rate harness (006-7303H) and end of bale harness (006-7400) to the DCP (006-6671LS).
E. Attach Pump Control Harness (006-5650F3M) between Pump Controller (006-5672) and DCP (006-6671LS).
F. Connect Keyed Power Extension harness (006-5650K) to a keyed power source.
G. Connect the iPad Integration Control (030-6672C) to the Communication Harness (006-6650TM).
Note: The Optional Port and the Data Transfer Port are not used in this application.
Keyed Power Extension
006-5650K
Dual Channel
Processor (DCP)
006-6671LS
Moisture/Bale Rate Harness
006-7303H
Proximity Sensor (2X)
006-7303S
Star Wheel
Assembly (2X)
006-4641
End of Bale Sensor
006-7400
Flow Meter
006-4725A
Optional Port
Pump Harness
006-4660Z
Pump Controller
006-5672
Terminating Resistor
006-5650Z
Pump Controller
Harness
006-5650FM
Active Terminator
from Baler Harness
Baler Interface Harness
006-6650VA
iPad Integration Control
030-6672C
Orange Wire to
Keyed Power
Power/Comm Harness on Baler
006-6650LS2
Power/Comm Harness on Tractor
006-6650TM
Data
Transfer
Baler
Connection
*AGCO 2100 Series Balers Pre 2012 will
need the Integration Harness 006-6650VAX