Installation Guide

6
2. Main Wire Harness and Baler Interface Harness Routing and Connections
A. Route harness 006-6650LS2 along this path or similar inside of the
baler. Keep harnesses away from moving parts and hydraulic hoses.
Secure with existing cable clamps or use cable ties. When all connections
are made to the DCP secure wires as shown above to allow for water to be
shed away from the DCP.
B. Under the chamber locate the Active Terminator from the end of the
baler harness. It is located at the right rear corner of the baler frame. Attach
Baler Interface Harness (006-6650VA) to that location. Reconnect Active
Terminator to open port of that same harness (006-6650VA). If your baler
does not have a Terminator at this location please call Harvest Tec.
If your baler has the White Terminating Resistor you will need to attach the
Pre 2012 AGCO Integration Harness (006-6650VAX) to the end of the Baler
Interface harness (006-6650VA). Please contact Harvest Tec for this
harness. This style terminator may be next to the Baler’s Main Processor.
UHD Baler ISOBUS Integration Connection
Under the chamber locate the harness labeled (LHR-C72 ISOBUS Term). It
is located at the right rear corner of the baler frame. Attach Baler Interface
Harness (006-6650VAU) to that location