Install Instructions
INSTALLATION INSTRUCTIONS
Universal Roof Brace Kit (URBK / JURGK-1)
READ INSTRUCTIONS CAREFULLY BEFORE STARTING THE PROJECT. REMEMBER THAT SAFETY COMES FIRST. OUR CHIMNEY SYSTEMS ARE
DESIGNED FOR INSTALLATION BY A QUALIFIED PERSON IN ACCORDANCE WITH LOCAL BUILDING CODES.
Selkirk Chimney parts are Listed and produced under the Factory Inspection and Follow-up program of
Underwriters Laboratories, Inc. and carry the LISTING MARK illustrated here.
Read the following instructions in their entirety before assembling and installing. Refer to the main Chimney System Installation Instructions for
further information on installation of Selkirk chimney.
CAUTION:
WEAR CUT RESISTANT GLOVES WHILE HANDLING METAL
PARTS TO AVOID PERSONAL INJURY. SHARP EDGES OR PRO-
JECTIONS CAN CUT YOU.
The URBK/JURGK-1 will provide lateral support to the chimney above the roof line. The URBK/JURGK-1 is required when the chimney extends
5 feet (1600mm) or more above the roof penetration. The kit contains Telescoping Legs, Support Band, Roof Angle Brackets and hardware
package.
The Universal Roof Brace Kit (URBK/jJURGK-1) accommodates most models of chimneys with outer diameters ranging from 7" through 13".
Holes used to assemble Support Band
Holes used to attach
Telescoping Legs to
Support Band
Figure 1
Support Band Holes Identifier
Figure 2
Cage Nut
Assembly of Universal
Support Band (2 Halves)
To Install:
A. Measure the outside (OD) diameter of your chimney.
B. From the single row of holes (see Figures 1 and 2), select the hole in each half that corresponds to the outside diameter identified with the
chimney being installed. Place the two halves together. Insert an elevator bolt through the chosen holes (Ex - for a 10” OD chimney, place
the elevator bolt through the holes identified for 10” OD). The elevator bolt should be oriented as shown in Figure 3. Secure the center bolt
with washers and 1/4” flanged nut (see Figure 3). NOTE: On smaller diameter chimneys the excess band material can be cut off.
Figure 3
Topview assembly of Support Band -
Elevator Bolt, Washers and Nut
Holes used to assemble Support Band
Holes used to attach
Telescoping Legs to
Support Band
Flanged Nut
Flat Washer
Support Band
Halves
Elevator
Bolt
C. Form the band into a circle (see Figure 4) and loosely connect
tabs using the supplied 2” bolt into the cage nut located on one of
the two formed tabs.
Assembly of Support Band:
D. Select the hole in each half that corresponds to the OD of the chimney. Insert an elevator bolt in each of the holes (1 per side).
Permissible for use with the following Models: TLC/UT/ST/GT/JSC/SPR/JM/ALT/CF
Cage Nuts
E. Position the Support Band approximately two thirds of the way up the chimney height (see Figure 8). The preferred location is next to a
joint, immediately above or below a Locking Band. Secure Support Band by tightening the 2” bolt. NOTE: Only one chimney joint should
be above a Roof Brace Kit. An additional Roof Brace Kit may be required for taller systems.
Tested to: UL 103 HT, ULC-S604, ULC-S610, ULC-S629
LISTED
A218
Figure 4
Universal Support Band
formed into a circle
2” Bolt
Cage Nut
One of 2 halves
of Support Band
One of 2 halves
of Support Band
Elevator
Bolt
Tab For
2” Bolt
Flat Washer
Cage
Nut
Tab for
2” Bolt
Holes for Telescoping
Legs to Support Band
Holes for Support Band
Holes for Support Band
Holes for Telescoping
Legs to Support Band


