User Manual
Table Of Contents
- REGULATORY AND SAFETY INFORMATION
- SPECIFICATIONS (GENERAL)
- INTRODUCTION
- GENERAL INFORMATION
- SITE PREPARATION
- EQUIPMENT INSTALLATION
- DC AND TONE REMOTE CONTROL INSTALLATION
- STATION TEST AND ALIGNMENT PROCEDURES
- INTRODUCTION
- GENERAL
- SUPPORT EQUIPMENT REQUIRED
- STATION CONFIGURATION
- STATION ALIGNMENT
- Preparation
- Station Pot Defaults
- Channel Guard (CG) Pot
- Transmit Limiter (TX) Pot
- Repeater Gain (RG) Pot
- DSP Line Input (DLI) Pot
- Compressor Gain (CP) Pot
- Compressor Threshold (CT) Pot
- DSP Line Cancellation (DC) Pot
- Line Output (LO) Pot
- P25 C4FM Deviation (DSP Module Adjustments)
- Enable the P25 Operation in the System Module
- Adjust P25 C4FM Deviation
- SINAD Test
- Squelch Adjustment
- Transmitter Forward and Reverse Power
- SYSTEM FUNCTIONAL TESTS
- MODULE TESTING AND ALIGNMENT
- PREVENTATIVE MAINTENANCE
- CHECKLISTS
MM102554V1 R1A
4
TABLE OF CONTENTS
Page
5.7.2 Electrical System................................................................................................................ 30
6. EQUIPMENT INSTALLATION ....................................................................................................... 31
6.1 INTRODUCTION........................................................................................................................... 31
6.2 UNPACKING EQUIPMENT ......................................................................................................... 31
6.3 EQUIPMENT INSTALLATION.................................................................................................... 32
6.3.1 Mounting Vendor Supplied RF Equipment ....................................................................... 32
6.3.2 Mounting Base Station Cabinet (Typical).......................................................................... 34
6.4 INTERIOR RF CABLING.............................................................................................................. 35
6.4.1 Cable Routing..................................................................................................................... 35
6.4.2 Install RF Cables ................................................................................................................ 35
6.5 CONNECTING ELECTRICAL POWER....................................................................................... 37
6.5.1 AC Power Distribution....................................................................................................... 38
6.5.2 Generator Backup............................................................................................................... 38
6.5.3 AC-DC Supply ................................................................................................................... 38
6.5.4 Battery Backup................................................................................................................... 38
6.5.5 UPS System........................................................................................................................ 39
6.6 POWER-UP SEQUENCE............................................................................................................... 39
7. DC AND TONE REMOTE CONTROL INSTALLATION ............................................................ 40
7.1 DC REMOTE INSTALLATION.................................................................................................... 40
7.1.1 Wiring Methods for DC Remote........................................................................................ 40
7.1.2 Installation Method 1 – Single Metallic Pair...................................................................... 43
7.1.3 Installation Method 2 – Single Metallic Pair with Earth Ground....................................... 43
7.1.4 Installation Method 3 - Metallic Control Pair, Audio Pair................................................. 43
7.1.5 Installation Method 4 - Full Duplex................................................................................... 45
7.2 E & M SIGNALING ....................................................................................................................... 45
7.2.1 Standard (Type II) E & M Signaling.................................................................................. 45
7.2.2 Type 1 E & M Signaling .................................................................................................... 46
7.3 TONE REMOTE INSTALLATION............................................................................................... 46
7.3.1 Voting System Considerations ........................................................................................... 48
7.3.2 Function Tones................................................................................................................... 48
7.3.3 Wiring Methods for Tone Remote ..................................................................................... 49
7.3.4 Installation Method 1 – Two Wire Tone Remote............................................................... 50
7.3.5 Installation Method 2 - Four Wire Tone Remote ............................................................... 50
7.4 T/R SHELF REMOTE CONTROL CONNECTIONS ................................................................... 50
7.4.1 Interface Board Connections.............................................................................................. 50
7.5 SQUELCH OPERATED RELAY OPTION (SXSU3D) ................................................................ 53
7.5.1 Installation.......................................................................................................................... 53
7.5.2 Operation............................................................................................................................ 53
7.6 SHARED REPEATER PANEL INSTALLATION........................................................................ 55
7.6.1 General ............................................................................................................................... 55
7.6.2 Repeater Panel Interface..................................................................................................... 55
8. STATION TEST AND ALIGNMENT PROCEDURES .................................................................. 58
8.1 INTRODUCTION........................................................................................................................... 58










