User Manual
HAZARDOUS VOLTA GES ARE PRESENT IN THE HOIST CONTROL BOX, OTHER ELECTRICAL
COMPONENTS, A ND CONNECTIONS BETWEEN THESE COMPONENTS.
Before performing ANY mechanical or electrical maintenance on the equipment, de-energize (disconnect) the main
switch supplying power to the equipment; and lock and tag the main switch in the de-energized position. Refer to
ANSI Z244.1, “Personnel Protection – Lockout/Tagout of Energy Sources”.
Only trained and competent personnel should inspect and repair this equipment.
It is the responsibility of the owner/user to install, inspect, test, maintain, and operate a trolley or hoist in accordance
with ANSI/ASME B30.16, “Safety Standard for Overhead Hoists”, OSHA Regulations and ANSI/NFPA 70, "National
Electric Code". If the trolley is installed as part of a total lifting system, such as an overhead crane or monorail, it is
also the responsibility of the owner/user to comply with the applicable ANSI/ASME B30 volume that addresses that
type of equipment.
It is the responsibility of the owner/user to have all personnel that will install, inspect, test, maintain, and operate a
hoist read the contents of this manual and applicable portions of ANSI/ASME B30.16, “Safety Standard for Overhead
Hoists”, OSHA Regulations and ANSI/NFPA 70, “National Electric Code”. If the trolley is installed as part of a total
lifting system, such as an overhead crane, the applicable ANSI/ASME B30 volume that addresses that type of
equipment must also be read by all personnel.
If the trolley owner/user requires additional information, or if any information in the manual is not clear, contact
Harrington or the distributor of the trolley . Do not install, inspect, test, maintain, or operate this trolley unless this
information is fully understood.
A regular schedule of inspection of the trolley in accordance with the requirements of ANSI/ASME B30.16 should be
established and records maintained.
6