Owner manual


3-90-70741R13_05/13
Installation
Installation
Place the boiler a minimum of 18” from a wall. The ue pipe must be at least 18” from anything combustible. The rear of
the hopper should be a minimum of 36” from the wall. The boiler should be placed on a non-combustible oor. Secure all
chimney connector pipe joints with a minimum of 3 sheet metal screws.
Draft Test Procedure
Attach a draft meter to the vent pipe on the boiler side of the barometric damper (if installed). With a re established, the
chimney draft should be between -.04 and -.06 inches of Water Column. If the ue draft exceeds these readings, install and
adjust the barometric damper accordingly.
DO NOT operate if the ue draft exceeds -.10 inches Water Column ( -24.9 Pa).
Next, remove the allen head set screw from the center of the rebox door and attach your draft meter. The rebox draft
should be -.04 to -.05 in W.C. Adjust the combustion blower restrictor plate, closed to increase the draft or open to decrease
rebox draft.
Clearances
Restrictor Plate
Combustion Blower