Owner manual

HI HLPT SERIES LOAD POINT ASSEMBLY
Page 2
tory, such damage is normally the responsibility
of the carrier and should be reported to them.
LOAD SENSOR CERTIFICATION SHEETS
ARE AVAILABLE 24 HOURS A DAY AT
OUR WEBSITE: http://www.hardysolu-
tions.com
Write down the serial number(s) on the inside of
the back cover for reference when talking to
Hardy Customer Service. Store this information
in a secure dry location for future reference.
Site Preparation All mounting surfaces for the base and loading
plate must be level. The Load Point Assemblies
in a system must be level to within +/- 0.5
o
.
Any welding should be done prior to installation
of the load points.
Precautions Always treat the Load Sensor as a precision
instrument. Leave the load point assembly in its
packaging until it is time for installation.
NEVER CARRY OR SWING THE LOAD SEN-
SORS BY THEIR CABLE.
Never allow moisture to get into any interconnec-
tions.
Basic Engineering
Principles for
Positioning Load
Point Assemblies
Load Points Assemblies should be positioned
such that the load (weight) is distributed as
evenly as possible between each load point
assembly in the scale.
When the installation does not allow even distri-
bution of the load, select higher capacity load
point assemblies. This does not effect the weigh-
ing accuracy of the scale.
All load point assemblies must have the same
capacity when used in one scale.