Installation Sheet
STEP 3 - Slide Installation
Using the front bracket and the top portion of
rear bracket from step 2, attach the slides with
(4) M4 X 6 at head machine screws provided
as shown.
STEP 4 - Organizer Installation
Place the organizer over the top of the rear bracket (left) and slide the slotted hole of the front bracket onto the screw started in step 2
(center) and tighten. Install the other two screws into the front brackets and secure tightly (right).
Re-install the attachment screw removed in step 2 (upper left). Cycle the unit a couple of times making sure the slide soft-close action
is working correctly. Check the unit for level, by fully extending and placing a level across the top of the organizer. If out of level, adjust
by loosening the two rear bracket screws and moving the rear of the unit either up or down for level. Re-tighten the rear screws and
add the set screw in the center bottom hole as shown.
STEP 5 - Hook Installation
There are three dierent types of hooks:
1. Straight Hooks – installed in the upper channel for larger
pots and pans to hang parallel to the organizer.
2. Angled Hooks – installed in the upper channel for smaller
pots and pans to hang perpendicular to the organizer.
3. Sway Bar Hooks – installed in the lower channel and used
to stop the swaying movement of the pots and pans.
All of the hooks are adjustable and will work in either channel.
Determine your pot pan layout and install the appropriate
upper channel hook by sliding it into the rear of the channel
(top). Install two sway bar hooks into the lower channel for each
upper hook chosen, the rst facing forward and the second
facing backward as shown (bottom). Once all of the hooks have
been installed on one side, determine the exact placement
of the pots and pans on that side, making sure they are not
touching. Using the provided T-Handle hex driver, tighten the
set screw in each of the hooks. Repeat on the other side.
Attachment
Screw
Rear Bracket
Screws
Set Screw Location
SWSHPPO21-1/18 v.1