408.5 19 r NIT AlN = 550 I u 129.25 IIs 214.5 214.5 388.
B2 T 15MM 31.75 31.75 5.5 107.5 129.25 wf 2 Note: I. "Mount-Board-R" is a mirrored part of "Mount-Board-L" 2. Holes need to be per-drilled onto the parts before mounting atom Phisher MOUNT-BOARD-L = 3 TAA 8 (ora, — Dem. a fh fend I IT lairs.