Product manual
Page8 For technical questions, please call 1-800-444-3353. Item61176
SAFETY OPERATION MAINTENANCESETUP
Workpiece and Work Area Set Up
1. Designateaworkareathatisclean
andwell-lit.Theworkareamustnot
allowaccessbychildrenorpetsto
preventdistractionandinjury.
2. Vehicleexhaustfumesandaccumulated
refrigerantgascankillyou.Donotoperate
vehicle’sengineorserviceairconditioner
inenclosedorpoorlyventilatedarea.
3. Routethepowercordalongasaferoute
toreachtheworkareawithoutcreatinga
trippinghazardorexposingthepowercord
topossibledamage.Thepowercordmust
reachtheworkareawithenoughextralength
toallowfreemovementwhileworking.
4. Setthevehicle’sparkingbrake,
blockthetires,andsetthevehicle’s
transmissiontoneutralorpark.
General Operating Instructions
TO PREVENT SERIOUS INJURY AND DEATH FROM EXPLOSION:
Service of air conditioning systems must be done only by trained
and experienced technician to avoid overfilling.
Technicians opening refrigeration circuit in automotive air conditioning systems MUST be
certified in refrigerant recovery and recycling procedures in compliance with section 609 of
Clean Air Act Amendments of 1990. For additional information regarding ozone depletion
and air conditioning service regulations, visit EPA’s website: www.epa.gov/ozone
1. BeforeoperatingtheVacuumPump,
checktheoillevelasexplainedunder
Tool Set Uponpage7.
2. UseonlyoneInletFittingatatime.Keep
theotherFittingcappedwhilenotinuse.
3. Turnthevehicle/appliance
andACsystemOFF.
4. Asappropriate,attachtheR-12,
R-22,orR-134AmanifoldtotheAC
drainportofthevehicle/appliance.
Thisisa“quickrelease”fitting.Thedrain
portisgenerallythelowerofthetwomanifold
portsandwillbelocateddownstreamfrom
thecompressorinthevehicle/appliance.
Refertothevehicle/applianceowner’s
manualforvehicle-specificinformation.
5. AttachanACrefrigerantrecovery
systemanddraintherefrigerant.
6. Afterreaching26to28in/hgvacuum,
stopanddisconnecttherecoverysystem.
7. AttachthisVacuumPumpandrun
for10minutestofurtherraisethe
vacuumlevelinsidetheACsystem.
8. TurntheSwitchON.
9. Thevacuumwillbuildforapproximately
2minutesbeforereachingfullpower.
AllowthePumptooperateforapproximately
10minutestothoroughlyremoveall
moistureandgasfromthesystem.
10.TheGauge(notincluded)shouldshow
negativepressureandmaintainthatreading
for10minutes.If,duringthattimethe
pressurereadingrisesbacktoward“0”,
theremaybealeakinthesystem.
11.CloseallvalvesontheManifold
(soldseparately),andturntheSwitchOFF
beforedisconnectingthehose
fromthevacuumfitting.
12.Topreventaccidents,unplug
thePowerCordafteruse.
13.AllowtheVacuumPumptocompletely
coolbeforewipingdownandstoring
indoorsoutofchildren’sreach.
NOTE:Theprocessisthesameforbothvehicleandotherrefrigerationsystems.










