Product manual

Page 14 For technical questions, please call 1-888-866-5797. ITEM 61614
SAFETY OPERATION MAINTENANCESETUP
Battery Setup Instructions
1. Place a fully charged, lead-acid 12 volt,
36 Ah battery (not included) in a stable,
flat location near the engine.
2. Only use cables sized to match
their length according to .
Cable Gauge
(lower gauge numbers
mean thicker cables)
Maximum
Cable Length
6 5′
4 7′
2 12′
Table A: Minimum Cable Diameters
3. Attach the positive cable from the positive battery
terminal to the outer terminal on the Starter’s (164)
solenoid, see Figure Q and Figure R. Connect cable
securely to prevent disconnection and short circuits.
4. Attach the negative cable to the
negative battery terminal.
5. Connect the negative cable securely to one
of the engine mounting bolts, as shown
in Figure Q. Connect cable securely to
prevent disconnection and short circuits.
6. Coat the terminals and cable ends with
a corrosion-preventive coating.
solenoid on
Starter (164)
red wire
to positive
battery cable
connect negative
battery cable to
a mounting bolt
Figure Q: Battery Cable Connections
Connect Cable
from Positive
Battery
Terminal to
this Starter
Terminal
Figure R: Connect Positive to this Terminal