Product manual
Page 9For technical questions, please call 1-800-444-3353.Item 61484
SAFETYOPERATIONMAINTENANCE SETUP
Attaching the Pulley Cover Knob
1. Slide the Pulley Cover Knob (124) into the
hole in the front of the Pulley Cover.
2. Screw the Pan-Head Screw (125) into the
knob from the inside of the Pulley Cover.
Installing the Drive Belts
1. Undo the Belt Tension Locking Knobs (84) on both
sides of the Head. Turn the Belt Tension Lever
(96) clockwise to bring the Motor Pulley 107)
towards the Spindle Pulley (44). This will allow
the Belts to be easily slipped over the Pulleys.
2. Consult the chart inside the pulley cover
(or Figure F on page 12), and install the
Belts (47, 116) in the positions corresponding
to the required spindle/drill speed.
3. Turn the Belt Tension Lever counterclockwise
so that tension is applied to the belts.
IMPORTANT: Tension is correct when the belts
deflect by approximately 1/2″ at their centers of
run when using reasonable thumb pressure.
Deflection
Distance = 1/2"
Figure D
4. Use the Belt Tension Locking Knobs to
lock the Motor Pulley in this position.










