Product manual
Page 5
For technical questions, please call 1-800-444-3353.
Items 60344-47
SAFETYOPERATIONINSPECTION INSTALLATION
Specifications
Model
60346
60347
60345
60344
Electrical Rating
120V~ / 60Hz / 4.1A
120V~ / 60Hz / 7.1A
120V~ / 60Hz / 8.5A
120V~ / 60Hz / 10.7A
Rated Capacity
440 lb.
double line
220 lb. single line
880 lb.
double line
440 lb. single line
1100 lb.
double line
550 lb. single line
1300 lb.
double line
650 lb. single line
Lifting Speed
33 FPM (single); 16.5 FPM (double)
Cable Length
39'
39'
40'
48'
Cable Diameter
1/8"
9/64"
11/64"
3/16"
Duty Cycle
25%*
20%*
*This Hoist has a 20% or 25% duty cycle. This means that the Hoist may only be run up to 2
minutes at a time
(2 minutes, 30
seconds in use for 60346/60347) and then it must be allowed to rest for at least 8 minutes
(7 minutes, 30
seconds off for 60346/60347) before further use.
Installation Instructions
Read the
ENTIRE
IM
P
ORTANT SAFET
Y
INFORMATION
Y INFORMATIONY
section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
Note:
For additional information regarding the parts listed in the following
For additional information regarding the parts listed in the following
pages,
refer to
Parts
Lists and Diagrams
on page
Lists and Diagrams on pageLists and Diagrams
10.
1.
The supporting structure the hoist is mounted to
(including trolley, monorail, or crane)
must be designed to withstand the loads and
forces imposed by the hoist for the rated load.
2.
Place the two Hanging Clamps over the supporting
structure where the hoist will be mounted.
3.
Have an assistant hold the Hoist in place and attach
the Hanging Clamps to the Housing using the Bolts,
Lock Washers, Washers and Nuts supplied.
4.
Once the Hoist is in position, tighten Nuts firmly.