Product manual

Page 7For technical questions, please call 1-888-866-5797.Item 67649
Weight Distribution Head Installation (continued)
5. After the angle is set properly, slide a Toothed
Washer (15) onto the other 3/4" Bolt (16) and insert
through the upper hole in the Weight Distribution
Head. Place the other Toothed Washer over the
Bolt end, thread a 3/4" Nut (12) onto the Bolt and
tighten securely. Refer to Figure G.
6. Tighten both 3/4" Nuts to 260 ft. lb. of torque
using a torque wrench (sold separately).
Connection Bracket Installation
1. Thread a 1/2" Bolt (6) into each Connection
Bracket (3) a turn or two. Place the Connection
Brackets on top of the trailer tongue with the Bolts
facing inwards. Refer to Figure H.
2. Swing the Spring Bars down under the brackets, and
pull the Chains straight up with no twist. Position
each Connection Bracket directly above its chain.
3. Tighten the 1/2" Bolts until they contact the trailer
and then 1/4 turn more. Do not overtighten.
After Installation
1. Proceed to Operation Instructions for
final setup and trailer attachment.
2. If trailer is not to be attached at this time, the
Spring Bars (4) MUST be removed:
Hold onto the Spring Bar while prying the Retaining
Pin Spring (2a) back, pulling the Bar Retaining
Pin (2b) outwards.
The Spring Bar should drop out of the Weight
Distribution Head (2).
Check local regulations to determine if other
components can be left in place or must also be
temporarily removed.
Bolt (16)
Weight Distribution
Head (2)
Toothed
Washer (15)
Square
Shank (1)
Nut (12)
Figure G
Connection
Bracket (3)
Connection
Bracket (3)
trailer and hitch
(sold separately)
Bolts (6)
Figure H
SAFETYOPERATIONMAINTENANCE INSTALLATION