Product manual
Page 8 For technical questions, please call 1-800-444-3353. Item 93358
Phase 2: Floor Plate Installation
All parts in this phase
are fastened using
16 Normal Bolts (65)
and 16 Nuts (67).
44
44
44
43
43
43
43
44
4
4
5
1a
2a
(Front)
(Right)
(Rear)
(Left)
3
6
3
47
a
b
c
Floor
Plate
Base
Plate
gravel
Hold-down Connector (47)
attachment
a. Slide Connector (47) under lip.
b. Insert Regular Bolt (65).
c. Fasten with Nut (67)
Grey parts are in place before this phase.










