Product manual
Page 14 For technical questions, please call 1-800-444-3353. Item 93358
Phase 5: Ceiling Plate Installation
Parts in this phase are fastened using
2 Normal Bolts (65),
8 Brace Bolts (66),
and 10 Nuts (67).
Additional Bolts and Nuts are already
in place before this phase.
(Front)
(Right)
(Rear)
(Left)
7
7
7
80
80
80
7
13
12
13
12
31
31
80
24, 25
48
48
Grey parts are in place before this phase.
Means that the nearby Bolt
will be removed and then re-
attached at the same location.










