Product manual
Page 10 For technical questions, please call 1-800-444-3353. Item 93358
47
47
67
67
65
65
7
Phase 3: Corner Post Installation
Parts in this phase
are fastened using
10 Normal Bolts (65),
14 Brace Bolts (66),
2 Double Brace Bolts (78),
and 26 Nuts (67).
(Front)
(Right)
(Rear)
(Left)
5
6
4
3
3
4
1a
2a
7
49
49
49
49
7
7
7
31
31
79
79
79
79
80
80
80
80
a
b
d
c
Floor
Plate
Base
Plate
gravel
Hold-down Connector (47)
attachment with Strut (79, 80)
a. Slide Connector (47) under lip.
b. Insert Brace Bolt (66).
c. Slide Strut (79, 80) over Bolt.
d. Fasten with Nut (67)
Grey parts are in place before this phase.










