Table of Contents Safety.......................................................... 3 Specifications.............................................. 4 Assembly..................................................... 5 Maintenance............................................... 29 Warranty..................................................... 32 Parts Lists................................................... 30 WARNING SYMBOLS AND DEFINITIONS This is the safety alert symbol.
IMPORTANT SAFETY INFORMATION The warnings, precautions, and instructions discussed in this manual cannot cover all possible conditions and situations that may occur. The operator must understand that common sense and caution are factors, which cannot be built into this product, but must be supplied by the operator. Assembly / Installation Precautions 1. Assemble only according to these instructions. Improper assembly can create hazards. 6.
Specifications Overall Dimensions 1201/2″ W x 1441/2″ L x 123″ H Window Dimensions 231/4″ W x 311/4″ L Door Dimensions 751/2″ H x 351/2″ W x 11/4″ Thick Materials Aluminum Frame Transparent Polycarbonate Sheets Aluminum Thickness 0.038″ Polycarbonate Sheet Thickness 0.165″ Page 4 For technical questions, please call 1-800-444-3353.
Assembly Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this document including all text under subheadings therein before set up or use of this product. IMPORTANT–READ THE FOLLOWING CAREFULLY BEFORE PROCEEDING • The first step in assembly is to assemble a proper base. The greenhouse must be properly supported to help prevent property damage and injury in the event of strong winds or inclement weather.
Page 6 For technical questions, please call 1-800-444-3353. Item 93358 All parts in this phase are fastened using 32 Base Bolts (68) and 32 Base Nuts (69).
Base Assembly Instructions 1. Excavate an area for the base of the greenhouse. The area must be 10′ 2″ wide by 12′ 2″ long by 5″ deep. The floor of the hole must be level and square. The diagonal dimensions, from corner to corner, should each be 15′ 5″. 2. Assemble the Base outside the hole as shown below. Note that the angled edges of the Base Plates (43, 44) need to face the corners of the base. Use Base Bolts (68), Base Nuts (69), and Connectors (45, 46) to secure the pieces together. Item 93358 3.
Page 8 For technical questions, please call 1-800-444-3353. Item 93358 43 4 All parts in this phase are fastened using 16 Normal Bolts (65) and 16 Nuts (67). 44 5 (Rear) Phase 2: Floor Plate Installation (Left) 44 6 43 3 3 43 1a gravel c a Base Plate 47 4 44 (Front) 2a a. Slide Connector (47) under lip. b. Insert Regular Bolt (65). c. Fasten with Nut (67) 43 44 (Right) Hold-down Connector (47) attachment Floor Plate b Grey parts are in place before this phase.
Floor Plate Installation Instructions Front Floor Plate (1a, 2a) Rear/Side Floor Plates (3 – 6) gravel outside greenhouse Base Plate (43, 44) ground Cross Section 1. When placing the Floor Plates (1a–6) on top of the Base Plates (43, 44), align them as illustrated above. The lip should extend slightly over the edge of the Base Plate and the raised flange with bolt holes should face inside the greenhouse. 2. Place the Front-Left Floor Plate (1a) on top of the Base Plate (44).
Page 10 65 67 For technical questions, please call 1-800-444-3353. 7 31 79 47 49 5 Parts in this phase are fastened using 10 Normal Bolts (65), 14 Brace Bolts (66), 2 Double Brace Bolts (78), and 26 Nuts (67). 47 7 Phase 3: Corner Post Installation 80 4 (Rear) 67 65 Item 93358 (Left) 6 31 7 79 80 49 3 3 80 49 7 79 1a (Right) 4 a Base Plate 2a 79 (Front) 80 7 49 a. Slide Connector (47) under lip. b. Insert Brace Bolt (66). c. Slide Strut (79, 80) over Bolt. d.
Corner Post Installation Instructions 1. There are 4 Corner Posts (7) to be attached to the Floor Plates (1–6). The end with 2 holes should be at the bottom, as shown in the illustration in the center of this page. 7. Repeat steps 2 through 6 for the left rear Corner Post (7) on the left side. Keep in mind that the connections will be reversed compared to the right side. TOP 8.
Page 12 For technical questions, please call 1-800-444-3353. Item 93358 65 65 ,2 27 Step 2 3. Slide the Bolt heads on the Front-left Ceiling Plate (24) into the slot of the Right Door Rail (27) from the left edge until it rests against the Front-right Ceiling Plate (25). 25 Tighten the 2 right-most Nuts on the Ceiling Plate. 26 Step 1 Ceiling Plate (25) until the right end is flush, as shown. The illustration in the center of this page shows how to slide the Rail over the Bolt heads.
Phase 4b: Ceiling Plate Assembly, Side Parts in this phase are fastened using a total of 12 Normal Bolts (65) and 12 Nuts (67). 12 13 13 65 13 13 67 67 67 67 65 12 65 65 65 12 12 67 65 67 1. Insert a Plain Side Ceiling Plate (13) in the brackets on the end of a Side Ceiling Plate with Brackets (12). 2. Secure in place with 6 Normal Bolts (65) and 6 Nuts (67). The heads of the Bolts should all face the gutter side of the Ceiling Plates, as shown in the inset above. Item 93358 3.
Page 14 For technical questions, please call 1-800-444-3353. Item 93358 80 (Rear) 31 Parts in this phase are fastened using 2 Normal Bolts (65), 8 Brace Bolts (66), and 10 Nuts (67). Additional Bolts and Nuts are already in place before this phase. 7 13 31 48 48 Phase 5: Ceiling Plate Installation 7 (Left) 12 80 12 80 7 80 24 ,2 (Front) (Right) 13 5 Means that the nearby Bolt will be removed and then reattached at the same location. 7 Grey parts are in place before this phase.
Ceiling Plate Installation Instructions 1. Insert one Normal Bolt (65) through the Corner Bracket (49) and the upper hole in the Corner Post (7) at both front corners of the greenhouse, from the inside out, as shown above. This is for the later attachment of the Front Ceiling Plate (24-27). 4. Attach the Front Ceiling Plate (24, 25) to the 2 Normal Bolts (65) put in place in step 1 on the outside of the greenhouse, note orientation at right. 66 66 5.
For technical questions, please call 1-800-444-3353. 80 66,78,66 14 14 66(x4) 13 31 Parts in this phase are fastened using 8 Normal Bolts (65), 2 Brace Bolts (66), 4 Double Brace Bolts (78), and 14 Nuts (67). Additional Bolts and Nuts are already in place before this phase. 44 Brace Bolts (66) are inserted into Posts during this phase for use in phase 7.
Post Installation Instructions Note: All Posts (14, 16, 17) in this phase require extra Bolts to be inserted into their slot before assembly. The small numbers under the main part number on the facing page are the type and number of hardware. See the examples below: 17 66(x2) Post Part Number Inserted Bolt Part Numbers Meaning: Insert 2 Brace Bolts (66) into the Rear Right Post (17) before attaching it. Side Pos t (14) mu st extend no farthe r than ha lfwa the Post Connecto y up r (48).
Page 18 For technical questions, please call 1-800-444-3353. Item 93358 16 14 31 31 Parts in this phase are fastened using 2 Normal Bolts (65), 20 Brace Bolts (66), and 66 Nuts (67). Additional Bolts and Nuts are already in place before this phase.
(79, 8 0) 2. Using Brace Bolts (66), connect the Front Braces (32) between the Corner Posts (7) and the Doorway Posts (28, 29). Install Braces inside Posts but outside Struts, as shown in the diagram at the top of this page. Strut Note: Install the Braces on the walls so that they are level. If the frame is level and all Braces are level, the Braces should not interfere with one another.
Page 20 For technical questions, please call 1-800-444-3353. Item 93358 13 14 48 19 14 Parts in this phase are fastened using 36 Normal Bolts (65) and 36 Nuts (67). Additional Bolts and Nuts are already in place before this phase.
Gable and Crown Installation Instructions Note: Leave Bolts (65) finger tight until step 5 of this phase. 1. Use 1 Normal Bolt (65) each to attach the Front Gable Posts (20-23) to the outside top of the Front Ceiling Plates (24, 25) in the positions shown on facing page. The bottoms of the 2 outer Front Gable Posts (22, 23) will be secured using the Normal Bolts (65) already in place. The sloped ends of the Posts must be on the top and slant upward toward the center of the greenhouse. 5.
Page 22 For technical questions, please call 1-800-444-3353. Item 93358 12 15 66,65 Parts in this phase are fastened using 24 Normal Bolts (65), 20 Brace Bolts (66), 44 Nuts (67), and 8 Window Screws (71). Additional Bolts and Nuts are already in place before this phase.
Rafter and Brace Installation Instructions Note: All Rafters (15) require extra Bolts to be inserted into their slot before assembly. The small numbers under the main part number on the facing page are the type and number of hardware in the order they are inserted from the TOP of the Rafter.
Phase 10: Window Assembly and Installation 67 39 38 67 65 Parts in this phase are fastened using 16 Normal Bolts (65), 16 Nuts (67), and 8 Window Screws (71). 65 39 65 1. Attach the Side Window Frames (39) to the Top Window Frame (38), as shown to the left. The threaded shafts of the Bolts should extend out the bottom of the window. 2. Insert Normal Bolts (65) into the holes at other end of the Side Window Frames (39), so that the threads stick out the bottom of the window.
39 40 38 61 41 5. Attach the Window Brace (41) to the Bottom Window Frame (40) using 2 Window Screws (71). The holes on the Window Brace (41) should face away from the window, as shown below. 71 39 Top Window Frame (38) Crown (10, 11) 6. Hold the assembled window level with the ground at the outer edge of the Crown (10, 11). Slide the top edge of the Top Window Frame (38) into the slot at the top of the Crown (10, 11), see illustration to the left.
70 Page 26 64 37 51 (bottom) 51 For technical questions, please call 1-800-444-3353. 64 (front) 36 64 36 70 64 70 65 70 70 (top) 67 (Profiles exaggerated for clarity.
Door Assembly and Installation Instructions 5. Remove the protective film from both sides of four Door Panels (64). Slide the Door Panels into the door between the Door Frame (35-37) pieces. Parts in this phase are fastened using 8 Normal Bolts (65), 8 Nuts (67), and 40 Door Screws (70). 6. Attach the other Side Door Frame (33) to the Center Door Frames (36) in the same way. Note: The Door Screws (70) thread directly into the round portions in the center of the door frames.
Page 28 For technical questions, please call 1-800-444-3353.
Transparent Panel Installation Instructions Note: Remove the protective film from both sides of each panel before installing it. 1. Panel Clips (53) are used to secure the Transparent Panels in place on the Greenhouse, their locations are marked with X on the facing page. 2. The Roof Panels (60) and the Roof Window Panel (59) will need to be placed as shown in the insets on the facing page.
PLEASE READ THE FOLLOWING CAREFULLY THE MANUFACTURER AND/OR DISTRIBUTOR HAS PROVIDED THE PARTS LISTS IN THIS DOCUMENT AS A REFERENCE TOOL ONLY. NEITHER THE MANUFACTURER OR DISTRIBUTOR MAKES ANY REPRESENTATION OR WARRANTY OF ANY KIND TO THE BUYER THAT HE OR SHE IS QUALIFIED TO MAKE ANY REPAIRS TO THE PRODUCT, OR THAT HE OR SHE IS QUALIFIED TO REPLACE ANY PARTS OF THE PRODUCT.
Lengths given are rounded to the nearest inch. Hardware lengths are approximate.
Limited 90 Day Warranty Harbor Freight Tools Co. makes every effort to assure that its products meet high quality and durability standards, and warrants to the original purchaser that this product is free from defects in materials and workmanship for the period of 90 days from the date of purchase.