User Guide
1
MM-220 OR PM-220 METER REPLACEMENT INSTRUCTIONS
PARTS SUPPLIED WITH THIS KIT:
(1) MM-220 or PM-220 Replacement Meter (Multi-Meter or Plate Meter)
(2) Panel Drilling Templates
To start the installation, read these instructions very carefully. Now unplug the amplifier
and remove any input, output and control cables that may be connected to the back of the
amplifier. Place the amplifier on a book, front panel up, and remove the bottom screws holding the
feet and case in place. Lift the case up and remove it from the amplifier. Place the amplifier on the
bench with the front panel facing you. You are now ready to proceed with the installation.
( ) Remove the 15 sheet metal screws that hold the perforated cover in place and remove this
along with the top rear plate cover.
( ) Remove the 3 large and 2 small knobs from the front panel.
( ) Remove the nut and washer holding the band switch to the front panel.
( ) Remove the nuts and washers holding the meter switch and sensitivity pot to the front
panel.
( ) Remove the 2 Phillips-head screws on the right side of the front panel.
( ) Remove the 2 Phillips-head screws on the left side of the front panel and loosen the front
panel. It may require a slight prying action with a screwdriver to separate the front panel
from the chassis due to paint stickage.
( ) Pull out the pilot lamp assemblies from each meter.
( ) On the back of each meter remove the nuts that secure the solder lugs to the meter.
( ) Remove the terminal strip attached to the front panel. The lower left nut on the plate
current meter fastens it. The front panel should now be free.
( ) Remove and save the mounting nuts for both meters and remove the meters from the
panel. The panel should now be free of all parts except for the Heathkit logo.
( ) Take a moment to clean the face of the front panel with hot water and dishwashing
detergent.
( ) Cut the supplied template sheet in half to separate the two templates. One of these is a
spare.
( ) Place one of the templates on the rear of the front panel and very carefully align the hole
patterns of the meter being replaced. The adjacent meter should be very close to also
being aligned (holding the panel up to a light source will aid in alignment).
( ) Hold the template in place with tape so that it will not move during the following operations.
Now check the alignment again.