Instructions / Assembly
8
7
10
9
A C
H S
M 1M2 D CM 3
STEP 4
Connect All the Cables onto the
Control Box(8)
Port for
hand switch
Power port
Port for cable
connected to the
lifting column
2
E
x21
E
4
5
7
F
4x 4
8
STEP 5
Install the Tabletop, Hand Switch(7) and Control Box (8)
The expansion of the supporting
beam can be adjusted according
to the actual use.
Loosen
Pull
Tighten
The control box is to
be installed on the
tabletop underside