INITIAL PREPARATION & INSTALLATION:
Material needed:
a 3-wire power cable (for connection of HI8931/HI943500 to
the mains)
a PVC insulated 4-core cable (as connection cable between
HI8931 and HI8936)
rubber seals and a pipe sealant (for installation of HI7635)
FOR HI8931 AND HI8936 ONLY
• Remove the 4 screws and the top
of the HI8936 Process Conductivity
transmitter.
Connect the 2 wires connected to
the 4-20 mA and COM termi-
nals of the 4-core signal cable
from the conductivity transmitter
HI8936 to the terminals marked
mA input paying careful attention
to polarity. Connect the other 2
wires to the +20V and COM ter-
minals while paying careful atten-
tion to polarity.
Connect the 3-wire power cable to
the 4-screw terminal strip accord-
ing to the voltage level as indi-
cated and pay particular atten-
tion to the correct live, earth and
neutral terminal connections.