Specifications

10
6.2 Production Guide
For in-line modules manufactured by JFTECH, it is recommended to give priority to wave
soldering equipment for welding.Manual welding is only used when wave soldering
equipment cannot be used for welding.After unpacking, it is recommended to complete the
welding of the module within 24 hours, otherwise it needs to be placed in a drying cabinet
with a humidity of not more than 10% RH, or re-vacuum packed and record the exposure
time, the total exposure time does not exceed 168 hours.
Equipment and materials required for welding
Wave soldering equipment
Wave soldering fixture
Thermostatic soldering iron
Tin bar, tin wire, flux
Furnace temperature tester
Equipment required for baking