Instructions / Assembly
About ECTC 
8357 N. Rampart Range Rd., Unit 106 
PMB #154 
Roxborough, CO 80125 
Phone: +1 720-353-4977 
Fax: + 612-235-6484 
E-mail: laurie@ectc.com 
www.ectc.org 
Education and Standardization for a Growing Industry 
The Erosion Control Technology Council (ECTC) is committed to promoting cost-effective ero-
sion and sediment control solutions through leadership, standardization and education. ECTC 
assists agencies, engineers, designers, contractors and other entities in the proper applica-
tion, installation and specification of erosion control technologies while establishing guidelines 
for product quality, testing and performance. 
ECTC’s mission has grown even more important as new end-users look for guidance in em-
ploying RECPs, HECPs and SRFRs to comply with more stringent erosion/sediment control 
regulations. 
Installation Instructions in Conjunction with RECP / HECP 
For placement in conjunction with an 
HECP, install SRFR as directed in Step 
One through Step 8 above; then install 
the HECP as directed by manufacturer’s 
instructions. 
For placement in conjunction with 
RECPs, Install RECPs, as per manufactur-
er’s instructions, then install SRFRs on 
top of RECP ensuring intimate contact 
with the RECP along the entire length of 
the unit. Secure SRFR(s) as directed in 
Steps Five through Seven above. 
Maintenance and Installation 
Please refer to manufacturer for 
maintenance guidelines as this docu-
ment is only intended for typical instal-
lation recommendations. For the most 
effective SRFR installation use guide-
lines as recommended by the manufac-
turer. Manufacturers may also provide 
site specific recommendations. 
©Erosion Control Technology Council 2011. www.ectc.org 








