AssemblyInstructions

7
Solar Shed
SITE PREPARATION
Concrete Slab Floor System
Wooden Floor Kit
Slab Floor size for Extended Buildings
120 x 92
5
/8 10 x 8 305x235.2cm
120 x 138
1
/8 10 x 12 305x365.7cm
120 x 183
5
/8 10 x 16 305x487.6cm
120
(305cm)
120”
(305cm)
92
5
/8
(235.2
cm)
92
5
/8
(235.2
cm)
B
A
SITE PREPARATION
Site must be properly leveled.
Site should have natural drainage to
eliminate puddling under and around the
building.
Site should be covered with plastic film
to discourage grass growth under the
building and to serve as a vapor barrier.
Before assembling your building, you
must first construct a floor system. You
can:
A. Purchase our optional pre-cut Floor Kit.
B. Purchase materials to cut and build
your own wooden floor from the parts
list on Page 7 and Page 9 for extender
building.
NOTE: Our Pre-cut Floor Kits have been
designed for normal residential use. It is
characteristic for the floor panels to
deflect (flex) during normal use. If you
intend to store very heavy objects in your
building, you may want to consider adding
floor joists to reduce the span from 24” on
center to 16” or 12” on center.
OR
C. Install a 4” concrete slab floor system.
IF USING CONCRETE SLAB FLOOR
SYSTEM
Construct 4” Concrete Slab Floor
System as shown.
Bolt or nail 2 x 4 treated sill plates to the
slab to support the building’s frames and
wall panels. (Treated sill plates not
included.)
Upon completion of above steps, skip
“Floor Kit Assembly” section and proceed
to Step #2: Assembling Rear Wall.