AssemblyInstructions

59
Solar Shed
Cut Out
Cut Flush to Studs
Center
Door
Stiles DH
Use (4)
1" Scr
ews
1/2"x3/4"x68"
5/8" to
Outside of
Stud
Door Assembly
Siding
5/8"
ZO
1-1/2"
Finish
Nail
1-1/2"
Finish
Nail
3" Scr
ew
2" Nails
every 8"
between
scr
ews
2" Nails
every 8"
bet
ween
scr
ews
3" Screw
3" Screw
3/8 (.9 cm) gap
3/8 (.9 cm) gap
1
4
/
"
(
6
.
c
m
)
g
a
p
1
4
/
"
6
.
(
c
m
)
g
a
p
HN
2" Nails
2" Nails
In bet
ween
Scr
ews
(3) 3"
Scr
ews
13-E: With two people lift and position Door
centered left and right in door opening on
Door Wall with Door Trim (ZO) against
gable trim (HN) or butting to 2x6
overhang on tall wall. Note: 1/4” (.6 cm)
overhang at top of Doors. Connect Door
Trim (ZO) to Building with three 3” (7.5
cm) screws as shown. Install (ZO) to
side of Door. Butt to (HN) on 2x6
overhang and butt to door spacers and
nail with 2” nails. Remove Door Spacers
at this time and check door operation
then finish nailing hinge (ZO) with 2”
nails.
13E
1 -- Door Stop 1/2 x 3/4 x68” 20 x 10 x 19cm
2 DH -- Door Stile 5/8x3x 30
5
/8 2 x 4 x 77.8cm
Cut bottom plate in door
opening
flush to studs.
Install
1/2 x 3/4 x 68”
Door Stop with 1-1/2”
finish
nails. Keep 5/8” to
outside
of stud and keep
1/2” side to stud. Use
wood
glue (not included)
for
added strength.
Install
Door Stiles (DH)
with
1” screws to the
center of the Doors.
13D
Installing Door cont.
13-D:
Z
O
Z
O