Brezina Installation Manual

BAG # HARDWARE
15103 1" ROOFING NAIL X 175
STEP 26: RIDGE CAP (CONT'D)
CUT-OFF TWO RIDGE CAPS TO CREATE TWO PEAK CAPS AS SHOWN. (FIG. 4.6)
INSTALL PEAK CAPS IN A CROSS PATTERN TO PROTECT PEAK FROM RAIN. SECURE WITH TWO
ROOFING NAILS PER SIDE AS SHOWN. (FIG. 4.7)
APPLY ROOFING CAULK AROUND THE NAILS AND ON SEAMS AS NEEDED. (FIG. 4.8)
A
P
P
L
Y
R
O
O
F
I
N
G
C
A
U
L
K
A
R
O
U
N
D
N
A
I
LS
A
N
D
S
EA
M
.
FIG. 4.8
FIG. 4.6
PEAK CAP X2
PEAK CAP X2
X1 PER SIDE
1" ROOFING NAIL
FIG. 4.7
CUT-OFF
COLOR SIDE
" 11
3
4
5"