Brezina Installation Manual

STEP 25: SHINGLES (CONT'D)
INSTALL FIRST ROW OF SHINGLES FLUSH TO CENTER LINE AND DRIP EDGE AT BOTTOM. (FIG. 3.3)
USING YOUR SHINGLE HOOKED BLADE CUT SHINGLES ALONG RIDGE LINE. (FIG. 3.5)
CONTINUE INSTALLING ROWS OF SHINGLES BY SHIFTING TO THE LEFT PER MANUFACTURER'S
GUIDELINES. (FIG. 3.4)
SECOND ROW
RAIN SLOTS
FLUSH WITH
NOTCH (ALL)
FLUSH WITH
FIG. 3.5
THIRD ROW
FIFTH ROW
FIG. 3.4
FOURTH ROW
SIXTH ROW
SHIFT TO THE LEFT
PER MANUFACTURER'S GUIDELINES
FIRST ROW FLUSH WITH
CENTER MARK
DRIP EDGE
TABS DOWN
FIG. 3.3
FIRST ROW
FLUSH TO