Brezina Installation Manual

STEP 24: ROOF FELT (REQUIRED)
INSTALL FELT (NOT INCLUDED)FLUSH TO ALL ROOF EDGES OVERLAPPING 3". USE 9/16" OR
SHORTER STAPLES. (STAPLES NOT INCLUDED)
INSTALL FELT ON ALL FOUR SIDES OF ROOF.
LET FELT OVERLAP AT RIDGES, DO NOT CUT-OFF.
(ROOF FELT NOT INCLUDED)
(9/16" OR SHORTER STAPLES NOT INCLUDED)
MATERIALS
ROOF FELT 234 sq.ft.
STEP 24: ROOF FELT (REQUIRED)
O
VE
R
L
AP
FO
L
D
O
V
ER
FLUSH TO
DRIP EDGE
3" 3"