Brezina Installation Manual

2"
FIG. 1.3
BEND OVER
3/4" ROOFING NAIL
SNIP
HERE
DRIP EDGE
FIG. 1.2
45
STRAIGHT SNIP HERE
45°
CH
AL
K
L
I
NE
O
VE
R
L
AP
(
C
E
NT
E
R
M
AR
K)
FIG. 1.1
EDGE FLUSH
TO FASCIA
STEP 23: DRIP EDGE
INSTALL DRIP EDGE OVERLAPPING BY 2" FROM CENTER MARK. (FIG. 1.1)
OVERHANG DRIP EDGE AT THE CORNER, SNIP TOP OF DRIP EDGE (FIG. 1.2)
BEND OVER TO OTHER SIDE OF ROOF. (FIG. 1.3)
FOLLOW DIRECTIONS PROVIDED BY MANUFACTURER FOR NAILING PATTERN. ONLY NAIL TOP
OF DRIP EDGE AS SHOWN.
YOU MUST INSTALL DRIP EDGE TO VALIDATE YOUR WARRANTY
(DRIP EDGE NOT INCLUDED)
MATERIALS REQUIRED
DRIP EDGE 60ft
BAG # HARDWARE
15110 3/4" ROOFING NAIL X 60