Brezina Installation Manual

ASSEMBLYGUIDES
TOOLSREQUIRED:
PROPERMAINTENANCE
Checkmetalpartsforrust.Iffound,sandandrepaintusinganonleadpaintcomplyingwith16CFR
1303.
Inspectandtightenallhardwareaftercompletionofassembly:afterfirstmonthofuse:andthen
annually.Donotovertightenastocausecrushingandsplinteringofwood.
Checkforsharpedgesorprotrudingscrewthreads,addwashersifrequired.
Applyingawaterrepellentorstain(waterbased)onayearlybasisisimportantmaintenanceto
maintainmaximumlifeandperformanceoftheproduct.
Checkallwoodmembersfordeterioration,structuraldamageandsplintering.Sanddownsplintersand
replacedeterioratedwoodmembers.Aswithallwood,somecheckingandsmallcracksingrainis
normal.
Somegappingmayoccuratsomewoodconnections.
Keepvegetationtrimmedawayfromstructure.Waterfromsprinklersmustbekeptoffunit.
TapeMeasure SafetyGlasses
CarpentersLevel
HardHat
Drill/Driver
o 1/8DrillBit
o 1/4DrillBit
Square


Wrench
o 7/16,1/2"&
9/16
Ratchet
Socket
o 7/16,1/2&
9/16
ToolBelt
8StepLadder
TinSnips
6StepLadder

ChalkLine
SafetyGloves
CaulkGun
SmallBarClamp
UtilityKnife
o StraightBlades
o ShingleHooked
Blade
5