Brezina Installation Manual

STAMP ID WOOD COMPONENTS
Q BEAM REAR LONG X 4
V BEAM CENTER X 2
BAG # HARDWARE
1381BZ 5/16" T-NUT X 8
1720BZ 5/16" X 2-3/4" HEX BOLT X 8
1721BZ 5/16" WIDE WASHER X 8
1327PC #8 X 2-1/2" WOOD SCREW X 24
STEP 2: LONG BEAM ASSEMBLY (CONT'D)
ASSEMBLE TWO LONG BEAM ASSEMBLIES Q + V + Q + TU AS SHOWN BELOW. (FIG 2.3)
VERIFY ALL HOLES LINE-UP BEFORE SECURING WITH WOOD SCREWS. (FIG 2.4)
Q
Q
BOTH SIDES
HOLES MUST LINE-UP
NOTE:
V
5/16" T-NUT
5/16" WIDE WASHER
5/16" X 2-3/4" HEX BOLTS
NOTCHES
NOTCHES
FIG 2.3
TU
5/16" T-NUT
FIG 2.4
BEFORE INSERTING WOOD SCREWS.
FLUSH
BOTH SIDES
FLUSH
LO
N
G
B
E
A
M
A
S
S
E
M
B
L
Y
X2
BOTH SIDES
#8 X 2-1/2" WOOD SCREW
FLUSH
BOTH SIDES
BEAMS MUST BE STRAIGHT AT THIS STEP