User's Guide
Part Number 3080006.008 Rev. A ©2013, HES, Inc. 4
3. Installing the lock on the door
1. Slide lock into cutout.
2. Plug 48V PoE RJ-45
cable into lock. Lock will
beep once and perform
self test.
3. Optional: The DPS signal is closed when the handle is
resting in its locked position. The DPS circuit can be
extended to include normally open DPS switches arranged
in a series to monitor additional doors and panels.
4. Attach rear bracket with
screws.
DPS Extension Cable
DPS
Switches
(SPST-
NO): As
Needed
Optional
Switch #1
(SPST-NO):
Provided
Extending the DPS Circuit:
A: Remove the DPS jumper
B: Connect the included DPS
extension cable
C: Connect additional normally
open DPS switches as shown
to monitor additional panels.