User Guide

4
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Air supply treatment diad
Power socket
Power on/off
Inching/auto option switch
Inching switch jack
Filling volume regulation
hand wheel
Magnetic switch (back)
Fastening screw
Piston
Cartridge
rotary disk valve
Discharge nozzle
Emergency stop switch
Cartridge cylinder
15.Rotary disk cylinder
16.Hopper
Test Run
4⸠2
See Fig. 3 Whole Machine Parts. After getting ready of the preparation work
before startup, connect the “Inching Switch” (attached fittings) to the
corresponding jack (Fig. 3-5). Place the “Inching/Auto Option Switch” (Fig.
3-4) at the inching state, and then turn on the power on/off (Fig. 3-3) and check
and ensure the Emergency Stop Switch (Fig. 13) is in normal state (the
machine will enter emergency stop state if press it down). Feed the material to
the hopper or open the feeding pipe valve. Screw down all the connecting
yokes and start press the “Inching Switch” for test run.
Adjust the fore and back the throttles on the “Cartridge Cylinder” (Fig. 3-14)
to control the feeding and discharge speeds properly. Shake “filling volume
regulation hand wheel” (Fig. 3-6) to keep the “Magnetic Switch (back)” (Fig.
3-7) move forward and backward to adjust the filling volume as required. And
then lock “fastening screw” (Fig. 3-8).
Test whether repeated accuracy of filling volume is up to standard and check
whether the discharge nozzle leaks. Put into normal work if there is no
abnormal condition. The normal work may be done in inching or automatic
way (place the “Inching/Auto Option Switch” (Fig. 3-4) at automatic state).
Pay attention to properly adjust the interval time when the machine works in
automatic state.
After the machine stops, you MUST turn off the power on/off, pull out the
power plug and turn off the air supply valve. It is recommended to clean the
material tubes, discharge nozzle,cartridge before off duty.
Run
4⸠3
Stop
4⸠4
Fig. 3 Whole Machine Parts
4
1
2
3
4
5
6
8
9
10
11
12
13
14
7
15
16