Installation Guide
11
INSTALLATION 
REQUIREMENTS (CONTINUED)
GENERAL INFORMATION INSTALLATION REQUIREMENTSPRE-INSTALLATION INSTALLATION
Measure out 20-7/8" from the wall (where the base cabinet’s toekick line will be) and snap 
alineontheoorparalleltothewall.
Tondthehighestpointontheoor,placeoneendofa6'orlongerlevelattheendof
thecabinetrun.Checkthebubble.Raiseeitherenduntilitislevel.Marktheooratthe
endthatmakescontactwiththeoor.Thisisthehighpoint.
Check all around the room where base cabinets will be installed. Then check from high 
point to high point to determine the highest point.
Whenyouarecertainyouhavethehighestpointontheoor,placeyourlevelonthis
point and the other end against the wall.
Mark the wall at the bottom of the level. Do this in all directions where cabinets will be 
located.
Measure 34-1/2" up from the high point level line. Use a level to strike a level line on the 
wall. This is the Base Cabinet Top Level Line (without countertop). Do this on all walls that 
will receive base cabinets.
HIGH POINT LEVEL LINE
20-7/8" 
to Toekick
Base Cabinet 
Level Line
34-1/2" from 
High Level Line
34-1/2" from 
High Level Line
This line may need to move out 
if the wall bows out or leans in.
Highest Point
34-1/2"
Mark wall.
20-7/8"
Shim to Level
Level
Toekick Line
Toekick Line
Mark floor 
at high point.










