Installation Guide

3 HAMPTONBAY.COM
Please contact 1-855-HD-HAMPTON for further assistance.
Pre-Installation
PLANNING INSTALLATION
Read all instructions before installation.
To avoid damaging this product, place it on a soft, non-abrasive surface, such as carpet or cardboard.
IMPORTANT: Inspect the wire insulation for any
cuts, abrasions, or exposed copper that may have
occurred during shipping. If there is a defect in the
wire, do not attempt installation. Please call the
Customer Service Team at 1-855-HD-HAMPTON.
TOOLS REQUIRED
Phillips Wire Pliers
Screwdriver Stripper
Safety Electrical
Goggles Tape
HARDWARE INCLUDED
NOTE: Hardware not shown to actual size.
AA BB
CC DD EE FF
GG HH II
Part Description Quantity Part Description Quantity
AA Mounting bracket 1 FF Hex nut 1
BB Outlet box screw 2 GG Wire connector 3
CC
Green ground screw (Preassembled
to Mounting bracket (AA))
1
HH Lock washer 1
DD
Ring (Preassembled to screw collar
loop(EE))
1
II Threaded tube 1
EE Screw collar loop 1
NOTE: This product requires three 60W maximum
medium base (E26) type A bulbs or 13W maximum
medium base (E26) SBCFLs (sold separately).