Installation Guide and Users Manual 168/198 Series Island Mount Range Hood Suitable for: Standard Class “R” Class “E” Class “SP” Class IMPORTANT: Read and save these instructions. NOTICE: Installer: Leave this guide with the homeowner Homeowner: Keep this guide for future reference Island Mount Range Hood Rev. 2016u.
Important Safety Notice Read all Instructions before Installing and operating this appliance • • • • • The installation in this manual is intended for qualified installers, service technicians or persons with similar qualified background. Installation and electrical wiring must be done by qualified professionals and in accordance with all applicable codes and standards, including fire-rated construction. DO NOT attempt to install this appliance yourself.
Important Safety Notice Read all Instructions before Installing and operating this appliance • • • Clean ventilating fan frequently. Always use appropriate cookware and utensils size. Always use cookware appropriate for the size of the surface element. To reduce the risk of injury to persons in the event of a stove top grease fire: • • • SMOTHER FLAMES with a close-fitting lid, cookie sheet, or metal tray, then turn OFF the burner. BECAREFUL TO PREVENT BURNS.
Table of Contents INSTALLATION Tools needed....................................................3 Parts supplied...................................................4 Venting requirements.......................................5 Mount heights & clearance...........................5-6 Calculating vent system length.......................6 Venting methods & ductless conversion..........7 Charcoal filters & electrical requirements.......8 Preparation......................................................
Parts supplied: Range Hood (vary with model) Flappers Air diverter (Optional re-circulating kit) Remote Control (Optional w/ “R” Class Control) Charcoal Filter (Optional re-circulating kit) Upper standard chimney Lower standard chimney Flexible Duct Tube (Optional) Concrete Sleeve Anchor Stainless Steel Baffle or Aluminum Filter(s) Description Hexagonal Wood Screws and/or Concrete Sleeve Anchor Duct Set Inner Supporting Frame with Top Plate Outer Support Frame This Guide and Warranty Card 4mm x
Venting Requirements • • • • • • • Vent system must terminate to the outside (roof or side wall). DO NOT terminate the vent system in an attic or other enclosed area. DO NOT use 4” (10.2 cm) laundry-type wall caps. Use metal/aluminum vent only. Rigid metal/ aluminum vent is recommended. DO NOT use plastic vent. Always keep the duct clean to ensure proper airflow. Calculate the following figures before installation: 1. Distance from the floor to the ceiling. 2.
IMPORTANT: • A minimum of 6” round (standard for this range hood) or 3-1/4 x 10” rectangular duct (purchased separately) must be used to maintain maximum airflow efficiency. • Flexible 6” round duct provided for convenience, always use rigid type metal/aluminum ducts if available to maximize airflow when connecting to provided duct. • Please use Duct Run Calculation below to compute the total available duct run when using elbows, transitions and caps.
Venting Methods • • This range hood is factory set for venting through the roof or wall. For non-vented (re-circulating) installations, see Recirculating (Non-Vented) Kit on Page 11. Vent work can terminate either through the roof or wall. To vent through a wall, a 90° elbow is needed. IMPORTANT: • • • • NEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling, attics or garages. All exhaust must be ducted to the outside. Use metal/aluminum duct work only.
Charcoal Filter Installation NOTE: The charcoal filters are preinstalled if you purchased the range hood with re-circulating kit from us. 1. Remove aluminum filters on hood. 2. Remove the safety filter under the aluminum filter by unscrewing two screws, then position the charcoal filter and align the screw holes, reinstall and fasten two screws. 3. Reinstall the aluminum filters back to the hood. 4.
Preparation WARNING DO NOT INSTALL THE RANGE HOOD BEFORE TESTING IT. MECHANICAL DAMAGE MIGHT HAVE OCCURRED DURING TRANSPORTION. Plug in the range hood to the USA/Canada 120V standard outlet (220V for Europe and other countries), test the blower and the lights before installing it. Advanced Preparations: 1. Read the entire installation guide and users manual thoroughly, understand instructions and warnings. 2.
Installation Installations (refer to Page 4 for parts): 1. As illustrated in Figure 1A, drill four holes with diameter not exceeding 5/8” and depth of 3” to 3-1/2” on the false ceiling. Fasten two hexagonal wood screws at two of these holes opposite from each other, reserve approximately 1/8” for the top support plate as shown in Figure 1B. Cut out a circle of 7-1/2” diameter for duct work. Use appropriate anchors for your ceiling composition: • Wood ceiling: Use the provided hexagonal wood screw.
WARNING Installation (Continued) 4. As shown in Figure 4A, 4B and 4C, slide in both upper chimExcessive Weight ney and lower chimney, pay extra attention to sharp edges Require three or more person to move and on the chimneys and minimize chimney movements to avoid install this range hood. Spinal or other bodiscratches on the chimneys. You may use a screw driver to ly injuries could occur if it is not followed. prevent them from sliding down as illustrated in Figure 4C.
WARNING Installation (Continued) Due to excessive weight, two or more person is recommended for this step. 6. Install the hood body onto the support frame and secure it with sixteen (16) 4mm x 16mm Phillips Head Tapping Screw, see Figure 6A. Make sure the hood is secure before releasing. Run the duct tube and power cord through the top support plate above the ceiling, see Figure 6B. Recirculating (Non-Vented) Kit: If Re-Circulating Kit is not purchased, skip this step.