User Manual

Start Up Check List
46
CAFS Bottled-Air Operator/s Guide
p/n: 029-0020-85-0
4.10 START UP CHECK LIST
Before energizing the apparatus and the CAFSAttack system for the first
time make sure the following items are checked:
Electrical
Main cable harness connections are correct and tight. (See Figure 4-16:
“Primary CAFS Wire Harness,” on page 41.)
All cables and wires are secured and protected from damage during
operation.
Flow sensor cable properly connected to main cable harness (C1 and
C7).
Control and flow sensor cables properly folded and secured; radio anten-
nas, power lines and equipment away from cables.
The system is properly grounded using flat ground strap.
Correct voltage provided. Direct current, negative (–) ground.
Adequate current, ?? AMPS minimum, available. Main power direct to
battery, battery switch or solenoid without primer or other accessories
tied in.
Primary electrical and ground connections tight and protected from cor-
rosion with silicone sealant.
Splices in wires sealed from moisture using adhesive filled heat shrink
tubing.
Make sure the FoamLogix system is energized when either the CAFS-
Attack smart-switch WET or DRY button is pressed.
Air and Water
All HIGH pressure air lines are the proper size and type and all connec-
tions are tight.
WARNING !
ONCE THE AIR CYLINDERS ARE FULLY CHARGED AND THE SYSTEM IS
ENERGIZED, ALL HIGH PRESSURE LINES BETWEEN THE CYLINDER SHUT-
OFF VALVES AND THE PRESSURE BALANCING REGULATOR VALVES ARE
EXPOSED TO HIGH PRESSURE (4,500 PSI / 310 BAR).