4.10 START UP CHECK LIST
Before energizing the apparatus and the CAFSAttack system for the first
time make sure the following items are checked:
Electrical
❑ Main cable harness connections are correct and tight. (See Figure 4-16:
“Primary CAFS Wire Harness,” on page 41.)
❑ All cables and wires are secured and protected from damage during
operation.
❑ Flow sensor cable properly connected to main cable harness (C1 and
C7).
❑ Control and flow sensor cables properly folded and secured; radio anten-
nas, power lines and equipment away from cables.
❑ The system is properly grounded using flat ground strap.
❑ Correct voltage provided. Direct current, negative (–) ground.
❑ Adequate current, ?? AMPS minimum, available. Main power direct to
battery, battery switch or solenoid without primer or other accessories
tied in.
❑ Primary electrical and ground connections tight and protected from cor-
rosion with silicone sealant.
❑ Splices in wires sealed from moisture using adhesive filled heat shrink
tubing.
Make sure the FoamLogix system is energized when either the CAFS-
Attack smart-switch WET or DRY button is pressed.
Air and Water
❑ All HIGH pressure air lines are the proper size and type and all connec-
tions are tight.
WARNING !
ONCE THE AIR CYLINDERS ARE FULLY CHARGED AND THE SYSTEM IS
ENERGIZED, ALL HIGH PRESSURE LINES BETWEEN THE CYLINDER SHUT-
OFF VALVES AND THE PRESSURE BALANCING REGULATOR VALVES ARE
EXPOSED TO HIGH PRESSURE (4,500 PSI / 310 BAR).