Start Up Check List ❑
4.9 INSTALLATION AND DELIVERY CHECK LIST
After the CAFSAttack system is installed, use the following check list to ver-
ify installation and ensure proper system startup when the apparatus is
delivered to the end user.
Installation
Date Initials
_______ _______ ❑ CAFSAttack system is properly installed. See Section 4
“Installation - Retrofit Full Size Pumper” on page 25.
❑ Review previous Section 4.7 “Plumbing,” beginning on page
31.
❑ Review previous Section 4.8 “Electrical,” beginning on page
38.
❑ Also see heading “Start Up Check List” on page 46.
_______ _______ ❑ FoamLogix system calibration and operation checked. See
separate manual provided.
❑ FoamLogix Model 2.1A Installation and Operation Manual,
Hale p/n: 029-0020-74-0
❑ FoamLogix Model 3.3 and 5.0 Installation and Operation Man-
ual, Hale p/n: 029-0020-68-0
Delivery
Date _______ Initials
_______ ______ ❑ DOT Air cylinders proper filled (charged).
_______ _______ ❑ CAFSAttack shut-off valve is in the OFF (O) position (valve
handle in the horizontal position).
_______ _______ ❑ CAFSAttack WET/DRY smart-switch presets set to end user
specification. See Section 5a.1, heading “Smart-Switch cali-
bration” on page 51.
_______ _______ ❑ Proper CAFSAttack system operation demonstrated to end
user in accordance with manual procedures. See Section
5a.1, heading “Starting CAFSAttack” on page 54.
_______ _______ ❑ End user trained in proper operation of the CAFSAttack sys-
tem in accordance with manual procedures. See Section 5a.1,
heading “Starting CAFSAttack” on page 54.
_______ _______ ❑ Warranty registration card filled out by end user and mailed to
Hale Products Inc.
_______ _______ ❑ Two copies of Installation and Operation manual provided to
end user.