User Manual

45
CAFS Bottled-Air Operator/s Guide
p/n: 029-0020-85-0
Start Up Check List
4.9 INSTALLATION AND DELIVERY CHECK LIST
After the CAFSAttack system is installed, use the following check list to ver-
ify installation and ensure proper system startup when the apparatus is
delivered to the end user.
Installation
Date Initials
_______ _______ CAFSAttack system is properly installed. See Section 4
“Installation - Retrofit Full Size Pumper” on page 25.
Review previous Section 4.7 “Plumbing,” beginning on page
31.
Review previous Section 4.8 “Electrical,” beginning on page
38.
Also see heading “Start Up Check List” on page 46.
_______ _______ FoamLogix system calibration and operation checked. See
separate manual provided.
FoamLogix Model 2.1A Installation and Operation Manual,
Hale p/n: 029-0020-74-0
FoamLogix Model 3.3 and 5.0 Installation and Operation Man-
ual, Hale p/n: 029-0020-68-0
Delivery
Date _______ Initials
_______ ______ DOT Air cylinders proper filled (charged).
_______ _______ CAFSAttack shut-off valve is in the OFF (O) position (valve
handle in the horizontal position).
_______ _______ CAFSAttack WET/DRY smart-switch presets set to end user
specification. See Section 5a.1, heading “Smart-Switch cali-
bration” on page 51.
_______ _______ Proper CAFSAttack system operation demonstrated to end
user in accordance with manual procedures. See Section
5a.1, heading “Starting CAFSAttack” on page 54.
_______ _______ End user trained in proper operation of the CAFSAttack sys-
tem in accordance with manual procedures. See Section 5a.1,
heading “Starting CAFSAttack” on page 54.
_______ _______ Warranty registration card filled out by end user and mailed to
Hale Products Inc.
_______ _______ Two copies of Installation and Operation manual provided to
end user.