Owners Manual
10 49-5000255
ENGLISH
Clearances
• Inspect whether the installation location can sufficiently withstand the weight of connection kit and set the hoisting
bolts by reinforcing the beam if necessary. Use hoisting bolts in installation (referring to 2 for the preparation before
installation).
• Install the power wiring and power line of the connection kit at more than 1 m away from TV and radio to prevent the
image clutter and noise. But, there may be noise even if it is more than 1 m according to the different waves.
INSTALLATION INSTRUCTIONS
1. Pre-Installation
The installation location selected shall meet the following
conditions and be approved by users.
• The strength shall be sufficient to withstand the weight
of the connection kit
• Ensure that there is enough space for installation and
maintenance.
• There is space for inspection on the side and top of the
electric box.
• The length of piping between the indoor and outdoor
units shall be within the permissible range (referring to
the specification attached to the outdoor unit).
• Please install the connection kit in places where noise
will not influence the customers (such as washroom,
passageway, warehouse, equipment room, etc.). Places
with low noise level are not suggested for installation, such
as bedroom, drawing room, meeting room, office, etc.
NOTES:
• The electrical box can be changed as shown in item 3 of
the connection kit installation.
• Noise may be emitted by the connection kit during
operation or stopping of an indoor unit. Take adequate
precautions with the installation location.
Min 4”
Front view
Min 8” Min 8”
Min 12”
Top view
Wall mounted (Inches)
Ceiling mounted (Inches)
Front view Side view
Min 8”
Min 8”
Min 12”
Min 2”
Min 2”
Electrical box
Manhole must
be arranged on
the side of the
electrical box
20”
20”