Installation Guide
1) Fixation
The support of the outdoor unit shall be fixed onto the wall surface, and then the outdoor unit shall be fixed onto
the support  horizontally. In  case  the outdoor unit  is  wall-mounted  or  roof-mounted, the  support  shall  be  firmly
fixed, to avoid the damage of strong wind.
2) Installation of connecting pipes
The cone of the connecting pipes shall be aligned with the conical surface of corresponding valve connector.
The nut of connecting pipes shall be installed at a proper position and then be tightened with a spanner. Excessive
tightening torque shall be avoided, or otherwise the nut may be damaged.
• Vacuumizing
A digital vacuum gauge shall be connected for vacuumizing. The duration of vacuumizing shall be at least 15
minutes, and the pressure of
 the vacuum gauge shall be below 60Pa.Afterwards, the vacuumizing equipment shall 
be  closed, and  whether  the  reading  of  the  digital  vacuum  gauge  is  increased or  not  shall  be  observed  after  the 
pressure is maintained for 5 minutes. In case no leakage is identified, the two-way stop valve and three-way stop 
valve  of  the  outdoor  unit  may  be  opened.  Finally,  the  vacuumizing  hose  connected  to  the  outdoor  unit  can  be 
disassembled. 
• Leak Detection
The  joint  of  connecting  pipes  for  the  outdoor  unit  shall  be  subject  to  leak  detection  with  soap  bubble  or
dedicated leak detection equipment. 
• Post-installation Inspection Items and Test Run
Post-installation Inspection Items 
qesnoC dekcehC eB ot smetI uence of Improper Installation 
Whether the installation is firm or not  The unit may fall, vibrate or make a noise 
Whether the inspection on air leakage is completed The refrigerating capacity (heating capacity) may be 
insufficient 
Whether the unit is fully insulated  Condensation or drip may occur 
Whether the drainage is smooth or not  Condensation or drip may occur 
Whether the power voltage is identical to that 
marked on the nameplate 
Failure may occur or the parts may be burned 
Whether the circuit and pipeline are installed 
correctly 
Failure may occur or the parts may be burned 
Whether the unit is safely earthed  Electric leakage may occur 
Whether the type of wire is in line with relevant 
regulations 
Failure may occur or the parts may be burned 
Whether barriers are identified at the air inlet/outlet 
of the indoor/outdoor unit 
The refrigerating capacity (heating capacity) may be 
insufficient 
Whether the length of refrigerant pipes and the 
refrigerant amount charged are recorded 
The refrigerant amount charged cannot be confirmed 
Test Run 
1. Preparations
(1) Power  on  is  not  allowed  before  all  the  installation  operations  are  completed  and  before  the  leak
detection is proven qualified.
(2) The control circuit shall be connected correctly and all the wires shall be firmly connected.
(3) The two-way stop valve and three-way stop valve shall be opened.
(4) All the scattered articles (especially the metal filing and thread residue) shall be removed from the unit
body.
2. Method
s
(1) Switch 
on  the  power  supply  and  press  the  “ON/OFF”  on  the  remote  controller,  after  which  the  air
conditioner will start operating.
(2) Press  “Mode”  to  select  refrigeration,  heating  and  sweeping  wind,  and  observe  whether  the  air
conditioner is under normal operation.
6