Installation Guide
22
Installation Procedure 
Air Tightness Test 
After finishing connection 
of 
refrigerant pipe, it shall perform air tightness test. 
• The air tightness test adopts nitrogen tank to give pressure according to the pipe connection mode as the following figure 
shown. 
• The gas and  liquid valve are all in close state. 
In 
order to prevent the nitrogen entering the circulation system 
of 
outdoor 
unit, tighten the valve rod  before giving pressure (both gas and liquid valve rods). 
Low pressure piezometer 
\  High pre~sure piezometer 
stop valve totally closed 
I 
d 
I 
O 
td 
(Gas side) 
ovL 
VHQ 
n  oor - - u  oor 
.---
_  _ 
______ 
7 
-.,..,............,...., 
Meter separator 
J, 
--, 
,--
- - -
-, 
Completely tightened 
I
' 
I  Flare part 
1 
I  ' 
'  I 
I 
! 
1
, 
Completely tightened  : 
1' 
1 
Dischar  ing 
valie 
' 
I  I  Flare part 1 
L 
____ 
_ 
f  Manhole /:.'  !Dropping valve 
/  • 
~:: 
I 
,  --
:~.: 
I 
Nitrogen tank 
Indoor units 
L  Oufcfoor units  ' 
stop valve totally closed 
(Liquid side) 
1) Pressurize for over 3 minutes at 0.3MPa (3.0 kg/cm
2
g). 
2) Pressurize for over 3 minutes at 1.5MPa (15 kg/cm
2
g). A large 
leakage will be found. 
3) Pressurize for about 24 hours at 3.0MPa (30 kg/cm
2
g}. A small 
leakage will be found. 
• Check if the pressure drops 
If the pressure does not drop, then pass. 
If the pressure drops, then please check the leaking point. 
Line 
pressure gauge 
··-......_ 
. 
Tubing 
bring 
brazed 
-✓-
Sweatj6int 
\ 
Large 
slip-on 
connector  _ 
Service 
hose 
---
--
When pressurizing for 24 hours, a variation 
of 
1 • C 
in 
the ambient temperature will cause a variation of 
0.01 
MPa(0.1 kg/cm
2
g} 
in 
pressure. It shall be corrected during test. 
•  Checking the leaking point 
In 
1) to 3) steps, if the pressure drops, check the leakage 
in 
each joint by listening, touching and using soap water etc. 
to identify the leaking point. After confirming the leaking point, welding it again or tighten the nut tightly again. 