User manual
Table Of Contents
- SAFETY INSTRUCTIONS
- GETTING STARTED
- OPERATION
- Menu Tree
- Test Lead Connection
- Manual Testing
- Choose/Recall a Manual Test Number
- Edit Manual Test Settings
- Setting the Test Function
- Setting the Test Voltage or Test Current
- Setting the Test Frequency
- Setting the Upper and Lower Limits
- Setting a Reference Value
- Setting the Test Time (Timer)
- Setting the Ramp Up Time
- Creating a MANU Test File Name
- Setting the ARC Mode
- Setting PASS HOLD
- Setting FAIL HOLD
- Setting MAX HOLD
- Setting the Grounding Mode
- Saving and Exiting EDIT Status
- Running a MANU Test
- PASS / FAIL MANU Test
- Zeroing of the Test Leads (GB only)
- Special MANU Test Mode (000)
- Common Utility Settings
- Automatic Tests
- EXTERNAL CONTROL
- REMOTE CONTROL
- FAQ
- APPENDIX
- INDEX
GPT-9000 Series User Manual
90
5. The TEST indicator will be lit
orange when in the TEST status.
TEST
6. Each test will start by showing the remaining
ramp up time, followed by the remaining test
time. Each test will be tested in sequence until
the last test has finished or the test is stopped.
I R G B A C W D CW
F R E Q = 0 H z 6
0
100
k V
RA C = F FO
SET
MT I E = 0 0 3 . 2 SR
0 0 m AER F =# 0 .0
1 . 0 0 m AIH ES = 0T
0 0 . 1 S0A M P =R
T
remaining TIMER time
00 37
m A
remaining RAMP time
E MA U OT N A_ 1A U T O = 0 0 1 - 0 0
PASS/FAIL HOLD
1. If Pass Hold or Fail Hold is set to ON for a
manual test, then the tester will “hold” the
testing after a Pass/Fail result for that
particular test. See page 48, 50 for details.
I R G B A CW D C W
F R E Q = 0 H z 6
0
100
k V
RA C = F FO
LOH
MT I E = 0 0 3 . 2 SR
0 0 m AER F =# 0 .0
1 . 0 0 m AIH ES = 0T
0 0 . 1 S0A M P =R
D
00 37
m A
E MA U OT N A_ 1A U T O = 0 0 1 - 0 0
HOLD status
2. The PASS or FAIL indicator will
also be lit. The buzzer will NOT
sound.
PASS
FAIL
3. To continue to the next test after
HOLD is displayed on-screen,
press the START button.
START