User manual
Table Of Contents
- SAFETY INSTRUCTIONS
- GETTING STARTED
- OPERATION
- Menu Tree
- Test Lead Connection
- Manual Testing
- Choose/Recall a Manual Test Number
- Edit Manual Test Settings
- Setting the Test Function
- Setting the Test Voltage or Test Current
- Setting the Test Frequency
- Setting the Upper and Lower Limits
- Setting a Reference Value
- Setting the Test Time (Timer)
- Setting the Ramp Up Time
- Creating a MANU Test File Name
- Setting the ARC Mode
- Setting PASS HOLD
- Setting FAIL HOLD
- Setting MAX HOLD
- Setting the Grounding Mode
- Saving and Exiting EDIT Status
- Running a MANU Test
- PASS / FAIL MANU Test
- Zeroing of the Test Leads (GB only)
- Special MANU Test Mode (000)
- Common Utility Settings
- Automatic Tests
- EXTERNAL CONTROL
- REMOTE CONTROL
- FAQ
- APPENDIX
- INDEX
OPERATION
39
Steps
1. Press the UP / DOWN arrow keys
to bring the cursor to the voltage
setting.
I R G B A CW D C W I / LH O I M ET R
E
F R E Q = 0 H z 6
0
100
k V
RA C = F FO
IDE
MT I E = 0 0 1 . 0 SR
0 0 m AER F =# 0 .0MM A UN N A_
1 . 0 0 m AIH ES = 0T
0 0 . 1 S0A M P =R
T
2M A N U = * * * - 0 0
cursor
m A
2. Use the scroll wheel to set the
voltage level.
ACW
DCW
IR
GB
0.100kV ~ 5kV
0.100kV ~ 6kV
0.05kV ~ 1kV (50V steps)
3.00A ~ 30.00A
Note
When setting the voltage, be aware that a
maximum of 200VA can be set for ACW and 50W
for DCW.
The ground bond voltage (GBV) is calculated as
the HI SET limit x Test Current.
Setting the Test Frequency
Background
A test frequency of 60Hz or 50Hz can be set,
regardless of the input line voltage. The test
frequency setting only applies to ACW and GB
tests.
Steps
1. Press the UP / DOWN arrow keys
to bring the cursor to the FREQ
setting.