User manual
Table Of Contents
GPT-9600 Series User Manual
50
5. With the tester in READY status,
press the START button. The test
starts the first test and goes into
the TEST status for the first test.
START
6. The TEST indicator will be lit
orange when in the TEST status.
TEST
7. The first test will start by showing the
remaining test time.
8. For ACW or DCW tests, the scroll
wheel can be used to edit the test
voltage when the tester is in the
TEST status.
ACW
0.10kV ~ 5.0kV
DCW
0.10kV ~ 6.0kV
9. The test will continue until the test time runs
down or the test is stopped. When the test time
ends, the tester will automatically go onto the
second test.
Like the first test, the second test will show the
remaining test time and will continue until the
test time runs out or the test is stopped.
If both tests run to completion, each test will be
judged as a PASS or a FAIL, see page 52 for
details.