Instructions / Assembly
 Gutter Stuff 
   The original foam filter insert 
Proper Installation Procedures for Gutter Stuff 
All gutters to be fitted with Gutter Stuff should be thoroughly 
cleaned out, all leaves, debris, and roof grit should be removed and 
the gutters washed out, if possible. 
All downspouts should be cleared of any obstruction, especially 
where there are elbows. 
All gutters should be checked to ensure that they are properly 
sloped towards the downspouts. All Spikes and hangers should be 
securely tightened. Hangers should be added where needed. 
Insert Gutter Stuff into the gutter so that its narrowest point, (the 
sharpest angle) is tucked under the front lip of the gutter. Gutter 
Stuff® should run to the back of the gutter completely filling the 
space across the top of the gutter then turn at a 90º angle to sit 
snugly on the bottom of the gutter. 
Slide the Gutter Stuff into the gutter under each spike or hanger, 
then, tuck the front edge of the material under the lip of the gutter. 
Place the material sections into the gutter one piece after another 
making sure there are no gaps between sections. Miter the corners 
when gutters make a change in direction. 
A knife or scissors may be used to cut the material, if needed, at 
the end of each run. Do not stretch the material to make it fit as it 
will shrink back to its original form and leave gaps. 


