Operation Manual
Structural Group 7
Required structural groups
Delivered parts and
accessories
Fig. 9
Structural group 6 + 2
5.1.1 Example of Connection
Structural group 8 Delivered parts and
accessories
Fig.
10
Fig. 2 – pos. 5/2x
Fig. 2 – pos. 6
Fig. 2 – pos. 2
Structural group 9 Delivered parts and
accessories
Fig. 11
Structural group 7 + 8
Structural Group 10
Required structural groups
Delivered parts and
accessories
Fig. 12
Structural group 9
Fig. 2 – pos. 3
Fig. 2 – pos. 9
5.1.2 Pump Filling
Fig. 13
Fill the pump using the filler neck until clean water
runs out.
Tip: Screw the pump to a fir base (concrete so that it is not tilting when in use for a prolonged period of time.
Fixtures for screwing to be found on the pump bottom.
Place some vibration-damping material between the floor and the pump, such as a firm foam board