Operation Manual
GB
11
Structural Group 3
Required structural groups
Delivered parts and
accessories
+
Fig. 5
Structural group 2
Fig. 1 – Pos. 1
Fig. 1 – Pos. 13/8 x
Structural Group 4
Required structural groups
Delivered parts and
accessories
Fig. 6
Structural group 3
Fig. 1 – Pos. 3
Fig. 1 – Pos. 2
Fig. 1 – Pos. 6/2 x
Fig. 1 – Pos. 4
Fig. 1 – Pos. 5
5.1 Initial Operation Safety Instructions
• Unplug the machine before adjusting or maintaining it.
• Caution! Rotating blade may injure hands and fingers
• Before the initial operation, check that the electrical data on the plate correspond to those of the mains.
• If you use an extension cable, make sure that the wire for given in out is sufficient. Minimum diameter
1.0 mm2.
• Keep the table and the entire workplace clean. Clear the sawdust and unnecessary tools away.
• Around the saw, mind the places of stumbling risk. .
• If possible, the operator of the machine should not be distracted.
• Pay attention to the motor and blade rotations direction.
• Never brake the blade by a lateral pressure after the motor is switched off.










