Operation Manual
29
GSF 300 - 4 PS
Inspection and maintenance plan
Regular servicing period Before
any start-
up
After 1
month
After 3
months
After 6
months
After 12
months
At the
end of the
season
20
Hours of
operation
50 Hours
of opera-
tion
100 Hours
of opera-
tion
300 Hours
of opera-
tion
Engine oil
(10W-40)
max. 0,6 l
Inspection
Change
Spark plug Inspection
Clean
Change
Air lter Inspection
Clean
Change
*
Check the petrol level
Drain the petrol tank
Check the screwed connec-
tion
Check the cables
Lubricate the pivot points
Check the cooling
Clean the machine tho-
roughly. Spray the skids and
plough with oil
Provide appropriate servicing upon the earlier of the following: in the given month or after the specied hours of
operation have expired.
* Only the paper lter element
ENGLISH
GB
Güde_GSF_300_1.0.indd 29 06.07.12 10:41










